Print
     
   
Originally installed in 20013 as a project for when I retired from Okells. This brewery lay untouched until I left Okells in Sept 2018 and then I started experimental brews on the plant.   Plant as it is now, lots of modifications were made to allow Temp programmed Mashes,with a RIMS System installation, addition of Trub filter, a Hop Rocket, and lately Tri Clamp fittings throughout.